How a new system goes in
- Soil first. State rules call for a site and soil evaluation ahead of any design. On a Lake Granbury lot it usually tells you how much room you really have and whether a conventional field is even possible.
- Design. Bedroom count and living area set the size. The layout then has to clear the lake, wells and lot lines.
- County permit. No digging until Hood County Environmental Health approves the plan. We assemble the submittal.
- Build. Tanks set, lines run, then the field or the aerobic unit with its spray zone.
- Inspection. An inspector looks at everything open before backfill.
Conventional or aerobic
Given deep enough soil and the room for it, a tank and trench field is the easier system to own. On a large share of the lake lots we see, there is not. The evaluation makes that call, not a guess from the road. See aerobic system installation for how those are laid out on a tight lot.
What to have ready when you call
- The property address or a map pin, especially if the gate is off a lake road with no clear street sign
- Where the house will sit, if you know
- Bedrooms, plus an approximate size of the house
- Your well location, existing or planned
TCEQ's OSSF permit page explains the state side of the rules.