Why a Lake Granbury lot is a different job
Most of the lots we work on sit close to the water. The yard is short, the slope runs toward the lake, and the setbacks from the shoreline, wells and property lines eat up what little room is left. A conventional trench field often will not fit, or the soil is too thin over rock to do the work. That is why so many new systems around the lake are aerobic, and why the spray-head layout is usually the hardest part of the design.
Tight lots and weekend places
A weekend house that sits quiet all month and then fills up on a holiday weekend is hard on a small system. So is turning that cabin into a full-time home without changing the tank or the field. We design new systems for how the place really gets used, and we replace or convert the ones that were never sized for it.
What we see most around the lake
- Spray areas that pond since the heads ended up aimed at a slope or a low corner
- Old trench fields that failed on ground too shallow or too tight to rebuild in place
- Lines broken by roots, or by vehicles using the only path down to a dock
- Compressors and alarms that give out the weekend the family is in
Shopping for a lake house? Have us look before closing day. A look at the existing system, or at a vacant lot, can save a lot of surprise later.
The county's 200-foot lake rule
Hood County's 2023 on-site sewage order is stricter than the state minimum. On lots in subdivisions created after February 25, 2014, a new system may not be placed in a FEMA floodplain, or within 200 feet of the normal pool elevation of Lake Granbury and the centerline of its tributaries, or within 200 feet of the centerline of the Brazos River and its tributaries, whichever distance is greater. We design around that limit, and we will tell you up front if a lot looks too tight for a new system. The rule is in the county's 2023 order.